PLUG-AND-PLAY ENERGY MONITORING

Your energy data, live in minutes.

Edge Go pairs with the smart meter on your board and streams energy data straight into WideSky over its own cellular connection. Commission it from a phone and start viewing your interval data within minutes.

LPA Edge Go metering gateway
3 Stages to Go Live
<30 min Typical commissioning time
0 IT Required

What you have by the end of install day

Interval data from the meters already on your boards, commissioned by an electrician, in records that stand up to an audit.

Interval data from the meters you already have

Five-minute interval data starts on install day, National Measurement Institute certified or reporting grade, read from the meters already on your boards.

A rollout your electrician can finish alone

The cellular connection is factory provisioned and commissioning runs from a browser on any phone, so your electrical contractor completes the job in one visit.

Records accurate enough to bill from

Audit-ready interval records, with National Measurement Institute certification available where you bill tenants or submit to a scheme.

Built for portfolios needing site data now, not next quarter

Edge Go is a cellular metering gateway device that connects your existing meters to WideSky.

Cellular plug-and-play

Ships with a factory-loaded SIM. No fixed IP, no firewall requests, no on-site IT involvement.

Simple commissioning

Commissioned from the app in minutes. Scan the QR, select, verify and sign off.

Meter flexibility

Five ready-to-connect meters, single-phase through to multi-circuit, with current transformers to 2000 A, in billing-grade or reporting-grade.

Live data in WideSky

Interval readings stream into WideSky within minutes of commissioning. Ready to view, report on and share.

Simple commissioning. No site IT involvement.

The entire setup process runs from the installer’s phone. No laptops, no terminal sessions, no firewall changes.

Scan QR code on the unit

The pre-printed label opens the commissioning steps with the unit's asset identifier already loaded.

Confirm meter setup

Connect the pre-tested meters and confirm current transformer ratios. Direct-connect meters skip the current transformer step.

Data goes live

Live data checks run, sign-off photos are captured, and readings start streaming.

What live data does for your business

The same 5-minute feed drives sustainability reporting, operations and cost control.

Demand charges

See the half hour that set your peak and what was running during it, in time to shift or shed before the next billing period.

Usage profiles

24-hour load profiles show what runs after hours, when demand peaks, and which circuits drive it.

Hidden energy spend

Costs by site and circuit, instead of one line on a retailer bill. Anomalies surface the week they start, not at the invoice.

Your whole portfolio, site by site

What every site is using, which sites are costing you most, and the records to prove it.

Site energy at a glance

Consumption today, this week and this month, site by site.

Usage ranking

Every site ordered by consumption, so the heavy users stand out.

Portfolio reporting

Demand, energy and alarms rolled up for your team and your auditor.

Certificate and interval data

Billing-grade generation data with interval records ready to extract.

Data your auditor will accept.

Interval data accurate enough to bill from and traceable enough to submit.

National Greenhouse and Energy Reporting

Auditable interval data for energy and emissions reporting obligations.

Building sustainability ratings and environmental reporting

Consistent, timestamped consumption data for ratings submissions and benchmarking.

Embedded networks

Billing-grade data accurate enough to bill tenants from.

One device. Multiple meter options.

Edge Go

Cellular gateway and power meter, factory provisioned

Hardware that arrives configured, connected and tagged to your site. Mount it, power it up, data starts flowing.

What ships in the box
Industrial 4G connectivityBuilt for plant rooms, switchboards and remote sites.
SIM card fitted and activeInstalled and activated in the factory before dispatch.
Unique asset identifierEvery unit tagged to your site register on arrival.
Metering and gateway in oneA single unit measures the supply and sends the data.

PMC-230

Single-phase · direct-connect to 65 ASingle-phase tenants, site sheds and sub-metering.Full specifications →

PMC-340-A6 Left

PMC-340-WC

Three-phase · whole current to 100 ANew-build three-phase boards up to 100 A per phase.Full specifications →

CET PMC-340B-B (5A (6A), CT Input)

PMC-340-CT

Three-phase · external 5 A current transformersRetrofit and upgrade work where 5 A current transformers are already fitted.Full specifications →

CET PMC-352 wireless communication module with digital inputs, designed for IoT and energy monitoring in LPA and WideSky metering applications.

PMC-352

Three-phase · split-core current transformers to 2000 ALarge installations, main incomers and high-current busbars.Full specifications →

PMC-512

Multi-circuit · one unit, many loadsMulti-tenancy sub-metering and circuit-level monitoring.

What you need

Hardware, connectivity and platform in one arrangement.

An Edge Go unit

Gateway and cellular connection in one box, factory provisioned and tagged to your site.

A PMC-series meter

One of the four options above, billing grade or reporting grade.

A WideSky subscription

Where your readings live, with API access for your own systems.

Subscription options

Monthly No lock-in
Per meter, billed monthly
Scale up and down as boards are added or handed over. Suits construction sites and short-term metering.
Annual Preferred rate
Per meter, billed annually
One invoice for the year at a lower per-meter rate. Suits portfolios and permanent sites.

Both include data hosting, cellular data, WideSky access and API extracts. Talk to the team for per-meter and portfolio pricing.

Warranty and support

Edge Go is engineered and supported in Australia. When something goes wrong you talk to LPA, not a reseller.

2 years
Manufacturer warranty
On the Edge Go gateway, power supply and PMC-series meters (CTs 12 months). Free firmware updates for the life of the product.
Same day
Dead on arrival replacement dispatch
Dead on arrival within 30 days of dispatch: priority same-day replacement where stock allows, with freight covered both ways.
30 days
Early-failure swap-out credit
If a unit fails within 30 days of dispatch, LPA credits up to $300 toward the electrician’s time to swap out the faulty unit, claimed with a tax invoice.

If something fails, the clock runs like this

1
Call or email support
Asset identifier, serial and the fault. Many issues are resolved remotely by firmware or configuration, with no parts needed.
2
Return authorisation in 2 business days
A return authorisation is issued so the unit is tracked from the moment it ships.
3
Assessed in 5 business days
From receipt, with warranty coverage confirmed back to you.
4
Dispatched in 10 business days
Repaired or replacement unit on its way once the defect is confirmed.

Australian support desk: techsupport@lpaenergygroup.com or 1300 194 337.

Warranty runs from dispatch date. Benefits are in addition to your rights under the Australian Consumer Law.

Frequently asked questions

Does Edge Go work with the meters already installed on my boards?

Yes. Edge Go is a cellular gateway that reads PMC-series power meters over Modbus and streams the readings to WideSky. If your boards already have a compatible PMC-series meter fitted, Edge Go reads it as it stands. Where a board has no meter, Edge Go ships with one of four PMC-series options matched to the board.

Compatibility is confirmed site by site. Existing meters are checked against the supported PMC-series list before an order is placed.

How long does an Edge Go installation take?

Typical commissioning takes under 30 minutes per site once the meter is wired. The installer scans the QR code on the unit, confirms the meter setup and current transformer ratios, then runs a live data check. Readings appear in WideSky within minutes of sign-off.

Commissioning time is a typical figure from standard installations, not a guaranteed time. Actual time varies with board condition, site access and the wiring work required.

Do I need site IT, a fixed IP address or firewall changes?

No. Edge Go ships with a factory-loaded SIM and runs on its own cellular link, entirely separate from the site network. Everything it needs to connect is in the box, and commissioning runs in a browser on the installer's phone.

Cellular operation depends on carrier coverage at the meter location. Coverage is checked as part of the site assessment, and an external antenna may be required in basements, plant rooms and switchrooms.

Can an electrical contractor commission Edge Go without LPA on site?

Yes. The whole commissioning process runs in a phone browser. A licensed electrician wires the meter, scans the QR code and completes the guided steps in one visit. LPA's Australian support desk is available during the install if needed.

How often does Edge Go read the meter?

Edge Go delivers five-minute interval data as standard. That resolution is fine enough to identify the half hour that set a demand peak and to show what was running during it.

Is the data accurate enough to bill tenants from?

Where you bill tenants or submit to a scheme, specify a meter with National Measurement Institute pattern approval. Those options carry National Measurement Institute certification, and the interval records are timestamped and traceable, which is what an embedded network operator or an auditor requires. Reporting-grade options are available where certification is not required.

Suitability for tenant billing depends on the meter specified, how the embedded network is configured, and the requirements of your network operator, retailer or scheme. Confirm those requirements before ordering. Reporting-grade options are not suitable for billing.

What does NMI stand for?

In Australian energy, NMI is used for two different things. Most commonly it means the National Meter Identifier, also written as the National Metering Identifier, which is the unique number for the electricity connection at your address. When a meter is described as NMI approved or NMI certified, NMI means the National Measurement Institute, the body that grants pattern approval for meters used in trade. Edge Go reads National Measurement Institute pattern-approved meters where billing-grade accuracy is required. It is not a network revenue meter and does not replace the meter tied to your National Meter Identifier.

Can Edge Go data be used for National Greenhouse and Energy Reporting?

Yes. Edge Go produces auditable, timestamped interval records suitable for National Greenhouse and Energy Reporting submissions, building sustainability ratings and environmental reporting. The data is held in WideSky and can be extracted as interval records or through the API.

Edge Go provides the interval records that support a submission. Acceptance of any submission is determined by the relevant regulator, scheme administrator or auditor, and depends on the meter specified and how your reporting boundary is defined.

Which PMC-series meter should I choose?

PMC-230 for single-phase boards with a direct connection to 65 A. PMC-340-WC for three-phase boards with a whole current connection to 100 A. PMC-340-CT for three-phase retrofits where 5 A current transformers are already fitted. PMC-352 for main incomers, high-current busbars and large installations, using split-core current transformers to 2000 A.

This is general guidance. Meter selection must be confirmed by a licensed electrician against the actual board, supply arrangement and load at each site.

Can I get the readings into my own systems?

Yes. Every subscription includes API access, so interval readings can be pulled into your own reporting, building management or finance systems alongside the WideSky dashboards.

What does an Edge Go subscription include?

Monthly and annual options both include data hosting, cellular data, WideSky access and API extracts. Monthly is billed month to month and suits construction sites and short-term metering. Annual is billed per meter at a preferred rate and suits portfolios and permanent sites. Hardware is purchased separately, as an Edge Go gateway with the PMC-series meter matched to the board.

Inclusions and rates are indicative and subject to a written quotation and LPA's terms of supply. Talk to the team for current per-meter and portfolio pricing.

What happens if an Edge Go unit fails?

Edge Go carries a two year manufacturer warranty on the gateway, power supply and PMC-series meters, with current transformers covered for 12 months. Where a unit is confirmed dead on arrival within 30 days of dispatch, a replacement is dispatched the same day where stock allows, with freight covered both ways. For a unit that fails in service within 30 days of dispatch, LPA credits up to $300 toward the electrician's time to swap out the faulty unit, claimed with a tax invoice. Outside those windows, a return authorisation is issued within 2 business days, assessment takes 5 business days from receipt, and the repaired or replacement unit is dispatched within 10 business days of the defect being confirmed. Support is handled by the Australian desk on 1300 194 337.

Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. This warranty is in addition to those rights. Same-day dispatch applies only to units confirmed dead on arrival within 30 days of dispatch and where stock is available. The swap-out credit is up to $300, assessed against a tax invoice. Turnaround figures are targets from standard cases, not guaranteed times. Warranty runs from dispatch date. Full warranty terms apply.

DEPLOY QUICKLY. EXPAND STRATEGICALLY.

Talk to us about your sites

Deploying Edge Go across a portfolio, a construction project, or scaling up to the full WideSky energy management system.