Scan QR code on the unit
The pre-printed label opens the commissioning steps with the unit's asset identifier already loaded.
Edge Go pairs with an LPA smart meter to stream energy data straight into WideSky over its own cellular connection. Commission it from a phone and start viewing your interval data within minutes.
Edge Go connects to your existing compatible meter, or we supply the gateway and meter pre-tested.
Arrives programmed, with its own cellular connection separate from your building's network.
Readings are verified on site, then appear in WideSky ready for billing or reporting.
Ships with a factory-loaded SIM. No fixed IP, no firewall requests, no on-site IT involvement.
Commissioned from the app in minutes. Scan the QR, select, verify and sign off.
Five ready-to-connect meters, single-phase through to multi-circuit, with current transformers to 2000 A, in billing-grade or reporting-grade.
Interval readings stream into WideSky within minutes of commissioning. Ready to view, report on and share.

The pre-printed label opens the commissioning steps with the unit's asset identifier already loaded.

Connect the pre-tested meters and confirm current transformer ratios. Direct-connect meters skip the current transformer step.

Live data checks run, sign-off photos are captured, and readings start streaming.
Demand charges can make up a large part of most commercial bills. See the half hour that sets your peak and what was running, then shift or shed load before the next billing period.
Energy reporting requirements are tightening. Edge Go gives every site measured interval data, so your reports use real consumption, not estimates.
See every solar site in one portfolio view. Spot systems that are underperforming or offline, with generation data ready to support certificate claims.
Consumption today, this week and this month, site by site.
Every site ordered by consumption, so the heavy users stand out.
Demand, energy and alarms rolled up for your team and your auditor.
Billing-grade generation data with interval records ready to extract.
Auditable interval data for energy and emissions reporting obligations.
Consistent, timestamped consumption data for ratings submissions and benchmarking.
Billing-grade data accurate enough to bill tenants from.
Hardware that arrives configured, connected and tagged to your site. Mount it, commission it from a phone, and data starts flowing.

Single-phase · direct-connect to 65 ASingle-phase tenants, site sheds and sub-metering.Full specifications →

Three-phase · whole current to 100 ANew-build three-phase boards up to 100 A per phase.Full specifications →

Three-phase · external 5 A current transformersRetrofit and upgrade work where 5 A current transformers are already fitted.Full specifications →

Three-phase · split-core current transformers to 2000 ALarge installations, main incomers and high-current busbars.Full specifications →

Multi-circuit · one unit, many loadsMulti-tenancy sub-metering and circuit-level monitoring.Coming soon
Gateway and cellular connection in one box, factory provisioned and tagged to your site.
One of the five options above, billing grade or reporting grade.
Where your readings live, with API access for your own systems.
Both include data hosting, cellular data, WideSky access and API extracts. Talk to the team for per-device and portfolio pricing.
Australian support desk: techsupport@lpaenergygroup.com or 1300 194 337.
Warranty runs from dispatch date. Benefits are in addition to your rights under the Australian Consumer Law.
Yes. Edge Go is a cellular gateway that reads PMC-series power meters over Modbus and streams the readings to WideSky. If your boards already have a compatible PMC-series meter fitted, we can confirm if your existing meter can be retained, avoiding hte need to install new meters, and in some cases, allowing data fromt he last 12 months to be retrieved. Where a board has no meter, Edge Go ships with one of four PMC-series options matched to the board.
Compatibility is confirmed site by site. Existing meters are checked against the supported PMC-series list before an order is placed.
Typical install and commissioning takes around 30 minutes per site depending on switchboard access and complexity. Commissioning the Edge Go takes about 10 minutes after the meter is installed. The installer scans the QR code on the unit, confirms the meter setup, then runs a live data check. Readings appear in WideSky within minutes of sign-off.
Commissioning time is a typical figure from standard installations, not a guaranteed time. Actual time varies with board condition, site access and the wiring work required.
No. Edge Go ships with a factory-loaded SIM and runs on its own cellular link, entirely separate from the site network. Everything it needs to connect is in the box, and commissioning runs in a browser on the installer's phone.
Cellular operation depends on carrier coverage at the meter location. Coverage is checked as part of the site assessment, and an external antenna may be required in basements, plant rooms and switchrooms.
Yes. The whole commissioning process runs via the web app. A licensed electrician wires the meter, scans the QR code and completes the guided steps in one visit. LPA's Australian support desk is available during the install if needed.
Edge Go delivers five-minute interval data as standard, pushed to the cloud every 30 minutes.
When paired with an NMI compliant meter, either the PMC-230 or PMC-340, Edge Go allows customers the ability to collect billing read data.
In Australian energy, NMI is used for two different things. Most commonly it means the National Meter Identifier, also written as the National Metering Identifier, which is the unique number for the electricity connection at your address. When a meter is described as NMI approved or NMI certified, NMI means the National Measurement Institute, the body that grants pattern approval for meters used in trade. Edge Go reads National Measurement Institute pattern-approved meters where billing-grade accuracy is required. It is not a network revenue meter and does not replace the meter tied to your National Meter Identifier.
Yes. Edge Go produces auditable, timestamped interval records suitable for National Greenhouse and Energy Reporting submissions, building sustainability ratings and environmental reporting. The data is held in WideSky and can be extracted as interval records or through the API.
Edge Go provides the interval records that support a submission. Acceptance of any submission is determined by the relevant regulator, scheme administrator or auditor, and depends on the meter specified and how your reporting boundary is defined.
PMC-230 for single-phase boards with a direct connection to 65 A. PMC-340-WC for three-phase boards with a whole current connection to 100 A. PMC-340-CT for three-phase installations where current transformers are required. PMC-352 for reporting grade data, where installation space is limited, or a more cost effective solution is required. PMC-352 utilises split core current transformers ranging from 100A to 800A with rogowski coil options from 1250A to 5000A.
This is general guidance. Meter selection must be confirmed by a licensed electrician against the actual board, supply arrangement and load at each site.
Yes. Every subscription includes API access, so interval readings can be pulled into your own reporting, building management or finance systems alongside the WideSky dashboards.
Your Edge Go WideSky subscription includes simcard plan, data retrieval and storage, standard WideSky dashboards, support services, API access, and Account Mangement. Monthly is billed month to month and suits construction sites and short-term metering. Annual is billed per meter at a preferred rate and suits portfolios and permanent sites. Hardware is purchased separately, as an Edge Go gateway with the PMC-series meter matched to the board.
Inclusions and rates are indicative and subject to a written quotation and LPA's terms of supply. Talk to the team for current per-meter and portfolio pricing.
Edge Go carries a two year manufacturer warranty on the gateway, power supply and PMC-series meters, with current transformers covered for 12 months. Where a unit is confirmed dead on arrival within 30 days of dispatch, a replacement is dispatched the same day where stock allows, with freight covered both ways. For a unit that fails in service within 30 days of dispatch, LPA credits up to $300 toward the electrician's time to swap out the faulty unit, claimed with a tax invoice. Outside those windows, a return authorisation is issued within 2 business days, assessment takes 5 business days from receipt, and the repaired or replacement unit is dispatched within 10 business days of the defect being confirmed. Support is handled by the Australian desk on 1300 194 337.
Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. This warranty is in addition to those rights. Same-day dispatch applies only to units confirmed dead on arrival within 30 days of dispatch and where stock is available. The swap-out credit is up to $300, assessed against a tax invoice. Turnaround figures are targets from standard cases, not guaranteed times. Warranty runs from dispatch date. Full warranty terms apply.
Deploying Edge Go across a portfolio, a construction project, or scaling up to the full WideSky energy management system.