Edge Go on construction sites

Construction power, measured from day one

Cranes, hoists, site sheds and pumps all run on the builder’s supply. Edge Go meters it at the temporary board and streams five-minute data to WideSky, so spend and Green Star evidence build from the first pour.

~30 min
to fit at the site board
Fit Once
when the temporary board relocates, the metering goes with it
5 min
interval data, live on WideSky

The builder’s supply stops being a blind spot

Large projects draw on several supplies at once, and the first sight of cost is usually the retailer invoice. Metering the temporary boards closes that gap.

Every supply, one view

Each supply gets a meter and an Edge Go, and WideSky accumulates them into one project figure. Measured, not an informed estimate.

Spend lands with the work

Power costs track against cost codes month by month, instead of surfacing on an invoice weeks after the work is done.

Green Star evidence builds itself

Construction energy reporting needs metered date, not estimates. Interval records accumulate from day one, ready for submission.

Two reports from the same meter

The one five-minute feed drives commercial tracking and sustainability reporting.

Expenditure

Power spend by month, against cost codes

Bar chart of monthly construction power spend rising from March to August

Anomalies surface the week they start. A crane left running over the weekend shows up Monday, not at the end of the billing month.

Green Star

Evidence, not estimates

Cumulative construction energy curve reaching 421 megawatt hours to date

Cumulative construction energy from NMI-certified meters, timestamped and ready for submission at any point in the job.

Evidence, not estimates

The same feed that tracks spend builds the sustainability record.

Metered, not modelled

Cumulative construction energy measured by National Measurement Institute certified meters.

Timestamped and traceable

Interval records with a timestamp on every reading, so the trail holds up under review.

Submit at any milestone

Pull the records at practical completion, or at any point in between.

One unit, four meters

Whichever meter suits the board, the commissioning flow is the same
DIN-rail mount beside the meter, serial connection to its port, plug-pack or DIN-rail power supply, then scan to commission. Cellular out of the box, so no site network is needed and nothing waits on a network request.
Edge Go device 3D front final

PMC-230

Single-phase · NMI certifiedSite sheds and single-phase temporary supplies.Full specifications →

PMC-340-A6 Left

PMC-340-WC

Three-phase · NMI certifiedDirect-connected three-phase boards, billing grade.Full specifications →

CET PMC-340B-B (5A (6A), CT Input)

PMC-340-CT

Three-phase · NMI certifiedLarger supplies metered via external CTs, billing grade.Full specifications →

CET PMC-352 wireless communication module with digital inputs, designed for IoT and energy monitoring in LPA and WideSky metering applications.

PMC-352

Three-phase · compact installReporting data where board space is tight.Full specifications →

PMC-512

Multi-circuit · one unit, many loadsMulti-tenancy sub-metering and circuit-level monitoring.Coming soon

DIN-rail mounted and moved board to board as the job progresses. 4G out of the box, no site network needed.

Power event alerts

Know before it
becomes a delay

The same feed watches every monitored board. Trips, phase loss and potential safety events raise an alert the moment they happen, routed by email to whoever is on site.

A board that goes quiet mid-shift is found in minutes, not on the next site walk.

Supply lost

06:41

Hoist board · Level 8

Board went quiet mid-shift. Tripped breaker suspected.

Loss of phase

11:07

Tower crane board · L2 down

Two phases healthy, L2 at zero. Crane motors at risk.

Safety event

13:52

Site shed · repeated outages

RCD tripping for safety, three times in an hour. Possible earth leakage on the circuit.

Costs, meters and warranty

Pricing, the full meter range and the warranty process are the same as every Edge Go deployment.

What you need and what it costs

An Edge Go unit, a meter and a WideSky subscription, priced per site.

See pricing

Warranty and support

Two year manufacturer warranty, replacement dispatch and an Australian support desk.

See warranty
START WITH ONE BOARD

Talk to us about your project

From one temporary board to every supply on the job: hardware, meters, a WideSky subscription and a metering plan that moves with the build program.